Novi Sad gets a new bridge, location requirements are issued
The Ministry of Construction, Transport and Infrastructure has issued location requirements for the construction of the bridge in the extension of Bulevar Evrope Street.
The requirements were issued, as stated in the document, for the „phased construction of the bypass around Novi Sad with the bridge over the Danube“, i.e. for the needs of „a conceptual design, project for the construction permit and the main design“ in accordance with the General Regulatory Plan for the bridge in the extension of Bulevar Evrope Street in Novi Sad.
For the needs of issuing location requirements, in the short period from the end of November 2021 to the beginning of February 2022, more than 20 requirements of public companies, ministries and competent institutions were issued to the public company Koridori Srbije.
Among others, the requirements for the construction of the bridge were provided by the Provincial Institute for Environmental Protection and the Provincial Secretariat for Environmental Protection – the institutions to which environmental activists in recent months appealed most to react and prevent the destruction of the nature at Sodros, which would allegedly occur due to the bridge construction.
Izvor: 021
Foto: Pixabay